Skip links

Harnessing Wind Power for the Future – Our Production Relies on Renewable Energy

Since 2025, Cortec has been sourcing a significant portion of its electricity directly from the wind power plant in Zittau-Schlegel. This facility produces around 2,000 MWh of clean electricity annually, ensuring a stable and sustainable energy supply for us.

The conclusion of a direct 1:1 wind power agreement with the Schlegel wind farm, located in Saxony, Görlitz County, complements our existing in-house solar energy supply and represents another key element in our sustainable energy strategy.

By purchasing electricity directly, we not only benefit from predictable energy prices but also support the local energy transition and contribute to the continued economic operation of the wind farm.

By choosing to source wind power, we are investing in a future-proof energy solution that benefits both our company and the region in the long term. In this way, we actively contribute to the energy transition and ensure the sustainable development of our business.

Read the full article now:

Cortec schließt ein langfristiges wind4factory Windstrom PPA ab – wind4factory